Final report of the social impact study conducted in connection with the acquisition of land from Payyambalam to Neerkkadavu for the construction of the coastal highway
| Title | Date | View / Download |
|---|---|---|
| Final report of the social impact study conducted in connection with the acquisition of land from Payyambalam to Neerkkadavu for the construction of the coastal highway | 07/01/2026 | View (5 MB) |